Seven construction processes of steel structure workshop

Time:[2021-11-13]  Hits:2545

The main process flow of steel structure plant construction is as follows:

1. Construction setting out. According to the design requirements and drawing requirements, use theodolite and level for positioning. After determining the axis and elevation, confirm the position of steel frame footing.

2. Foundation embedded parts. Before foundation concrete pouring, the embedded bolts shall be fixed according to the size, and the embedded bolts shall be wrapped in advance to avoid pollution during concrete pouring. After the completion of concrete pouring, the concrete residue at the embedded anchor rod and screw port shall be cleaned in time.

3. Steel column hoisting. First, confirm the position of component lifting points and take protective measures. After lifting the steel column, align it close to the anchor bolt, align the mounting hole with the bolt, and then slowly put down the hook. After initial calibration, tighten the bolts.

4. Steel beam installation. After the steel column is rechecked, the steel beam shall be lifted and bound symmetrically at two points. When the datum face of steel beam and steel column is on time, butt joint adjustment and correction shall be carried out, and then fixed and connected.

5. Purlin installation. The purlin generally adopts the method of one hook and multiple lifting. The error is adjusted by moving the sample bar back and forth along the purlin, tightening and loosening the bolts, and finally fixed with bolts for correction.

6. Install wallboard. Start at the gable at one end and move on to the other. At the initial stage of construction, the operation platform shall be used for transition to ensure that the top plate is parallel and installed vertically through stay wire. It is best to form at one time and handle it with care to avoid scratching.

7. Workshop painting. First remove the stains on the metal surface, and then apply antirust paint. After the antirust paint is dry, start puttying. After the putty is completely dry, it shall be polished and leveled. Finally, apply anti phosphating primer.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
亚洲欧美大香蕉在线播放| 在线 免费 国产 日韩 欧美| 老鸭窝手机在线免费视频| 一区不卡欧美| 被大鸡巴操到高潮网站| 极品色影院| 亚洲国产精品制服丝袜久久久久久久| 亚洲熟妇五区| caoporn超碰在线成人| 台湾熟女99古装| 男人AV天堂国产| 日本8区码久久久久久久| 视屏91亚洲| 日韩国产麻豆一区二区| 亚洲色综合区无码一区二区三区| 色悠悠色综合网| 天堂久久久久久久久| 72AV成人日丰满少妇| 日韩电影午夜在线| 久久久久夜夜夜夜国产综合| 亚洲AV女优一区二区三区| 亚洲高清无毛无码网站| 老鸭窝久久久久久久精97| 日日操夜夜聊| 性生活视频网站在线看日韩| 亚洲Aⅴ精品久久无码| 大香蕉av日夜妻久久踩| 日韩蜜臀爱爱| 欧美与日韩精品| 小松杏亚洲中文字幕三区| 蜜桃有码| 普兰县| 草逼视频免费播放大全网址| 日本高清一区二区三区不卡| 日本色导航| 欧美日韩国产另类综合四色| 久久无码人妻精品蜜臀AV| 久久久欧美日韩一区二区三区| 日本插B视频免费在线观看| 亚洲综合久久久久久| 熟女91在线|