Steel structure warehouse hoisting process and hoisting plan-Chapter 1

Time:[2021-9-25]  Hits:3052

Hoisting process

 

Positioning --- Calibration Height --- Column Top Bolt Embedded --- Calibration Height - Elastic Line - Column Installation - Steel Beam Installation - Secondary Structure Installation --- --Welding----Repainting----Completion

 

 

Steel column installation process


A,Lifting of steel columns

 

1.Re-test the foundation, including the exposed length of the anchor bolt, the displacement deviation of the anchor bolt center line to the reference line, the distance between the anchor bolts, and the foundation elevation. The unqualified ones can be handled before lifting.

 

2.In order to control the installation elevation of the column, a 500mm position is also marked on the visible cross section of the column in advance for fine-tuning and correction of the elevation during installation. Install the steel column on the basis of qualified retest, first tie the column with a single steel wire rope, and choose the position of the lifting point at a position 1/3 of the length of the column from the end of the column. The column is lifted by the rotation method, and the steel column is lifted and sent to the installation position. The lashing place should be padded.

 

 

B, the correction of the steel column

 

1.Draw the center line in advance on the visible surface of the column, and then use the theodolite to adjust the verticality of the column in two mutually perpendicular directions.

 

2.Control the verticality of the column by measuring the distance between the inner side of the column and the control line on the building.

 

3.The adjustment of the elevation, axis and verticality deviation of the column are related to each other, and the correction work will be completed when all the standards are met.

 

 

Steel beam installation process

 

Unload the steel beams to the vicinity of each column, hoist them to the floor with a car, and then install them by mast cranes. The main beams with some heavy components can be platform craned with car cranes. The secondary beam can be installed with a self-made wheeled crane (5t). Starting from the third zone, the main girder, the secondary girder and then the purlin, the steel girder shall be hoisted by masts one by one according to the number. Only when the two ends of the girder are fastened with bolts (or spot welded firmly), the hooks can be loosened and the others are hoisted in sequence Steel beams. Weld after passing the inspection.
The lashing and hoisting points of steel beams are particularly important. Steel poles can be used when the steel beams are too long. There are many steel beams in this project with a maximum length of about 20m. A triangular hanging plate is used to enlarge the distance between the steel ropes to increase the angle of the steel ropes. Require. Schematic diagram of steel beam lashing.

 


Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
日韩欧美激情亚洲| 亚洲变态另类调教久久久| 优物日韩不卡在线| 欧美曰韩一区二区无线码| 亚洲色,欧美色| h小说网| 日本视频一区免费| 精品 一区二区三| 夜夜夜夜夜天干| 日韩人qi一区| 人人人干潮人人人干高潮| 精品中出美妇二区三区| 不卡aV高清| 操美女视频网站在线| 国产欧美日韩18 精品在线观看| 激情黄色成人网址| 精品久久电影HD| 后入日本人妻大屁股| 久久婷婷A片AAA| 中文字幕一本到一区二区三区| 国产视频h| 欧姜亚韩一区二区三区| 三级在线91| 吸咬奶头狂揉60分钟视频真实| 无码久久视频| 成人区一区二区三区亚洲| 激情综合色播网| 孰熟女人妻第一页| 亚洲熟女综合久久久| 日韩视频久久草| 欧美=级黄片| 伊人大香蕉福利视频| 亚洲综合色1区2区3区| 麻豆黄色一级电影| 亚洲中文字幕激情一区| 欧美性生活黄片久久久| 婷婷五月天久久久久| 尖扎县| 射精网站亚洲无码一区| 日韩一级二级三级视频在线观看| 美女av免费观看网址|