h无码在线观看,夜色色综合网,日韩AV免费久久,蜜臀久久综合视频

Language:CHINESESENGLISH

Home > News > During the installation of steel structure, the following problems shall be paid attention to:
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://linbaoquan.cn

During the installation of steel structure, the following problems shall be paid attention to:

Time:[2021-8-28]  Hits:2958

During the installation of steel structure, the following problems shall be paid attention to:

1. Before the installation of steel structure, all members shall be comprehensively inspected, such as whether the number, length, perpendicularity of members and the size between bolt holes at installation nodes meet the design requirements; The defects generated during fabrication and deformation generated during transportation shall be corrected on the ground and properly solved.

2. The steel column and foundation are generally connected by embedded anchor bolts. Therefore, before installing the steel column, check the size between the column base bolts, whether the length exposed to the foundation surface, the elevation of the foundation top meet the design requirements, and whether the thread of the column base anchor bolt is damaged (generally, measures are taken during foundation construction to protect the column base anchor bolt and its thread from being damaged).

3. When hoisting the steel structure, proper measures shall be taken to prevent excessive bending and torsion deformation. The contact part between the rope buckle and the component shall be padded with cushion blocks to prevent the component from being damaged.

4. After the steel structure is hoisted in place, the support and other connecting members shall be fastened in time to ensure the stability of the structure.

5. The hoisting of all superstructure can only be carried out after the substructure is in place, corrected and fastened with supporting members.

6. Assemble a large installation unit on the ground according to the lifting capacity of the site installation machinery to reduce the workload of high-altitude operation.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
99久久人妻无玛xi| 日本穴久久综合网| 久久久久网页| 鸡巴小穴av| 韩国成人三级片在线播放| 亚洲天堂久123| 中文 一区 有码 撸啊撸| 欧美一级淫片A片AAA| 免费视频在线99| 自拍偷拍亚洲欧美精品| 日本伦理久久视频永久入口| 亚洲性图99精品一区二区三区| 久久久精品粉嫩| 久久永久免费精品视频| 青青草无码国产免费久久精品| 人人弄人人操人人| 国产人妻中文欧美制服| 久久久超老熟女| 操在线视频播放| 国产一区二区三区视频老汉推车子| 日韩麻豆一区| 亚洲天堂性视频| 美女大逼网站| 爽黄片视频| 舔女的下面在线观看| 亚洲性爱网在线观看| 99国产午夜| 精品日韩熟妇爆乳一区二区| 日韩精品成人AV| av线路一区不卡在线| 伦理电影日韩99| 亚洲人页码视频在线观看| 激情五月婷婷伊人| 亚洲中文文字幕一区二区| 二区国产三区日韩欧美一区| 欧美激情9页| 亚洲一区掰开插入| 国产品精久久久| 国产av录像| 欧洲1级毛一区 二区 三区 婷婷| 全国无码一区二区三区|