h无码在线观看,夜色色综合网,日韩AV免费久久,蜜臀久久综合视频

Language:CHINESESENGLISH

Home > News > Common problems of Foshan steel structure column base installation
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://linbaoquan.cn

Common problems of Foshan steel structure column base installation

Time:[2021-4-7]  Hits:3320

Installation of column base

 

(1) Embedded parts (anchor bolt) problems: overall or layout deviation; elevation error; screw thread without protective measures. The bolt holes on the bottom plate of the steel column are directly out of alignment, resulting in insufficient thread length.

 

Measures: the steel structure construction unit cooperates with the civil construction unit to complete the embedded parts work, before the concrete pouring and tamping. Relevant dimensions must be rechecked and fixed firmly.

 

(2) The phenomenon of anchor bolt not vertical: the horizontal degree of the base plate of frame column column foot is poor, the anchor bolt is not vertical, and the horizontal error of embedded anchor bolt is too large after foundation construction. The columns are not in a straight line after installation, which makes the appearance of the house difficult to see, brings errors to the steel column installation, and affects the structural stress, which does not meet the requirements of the construction acceptance specification.

 

Measures: the anchor bolt installation should adhere to the bottom plate leveling with the lower adjustment bolt, and then the secondary grouting of non shrinkage mortar, and the construction method abroad. Therefore, during the construction of anchor bolt, steel bar or angle steel can be used to fix anchor bolt. Welding into a cage, improving the support, or taking some other effective measures to avoid the anchor bolt moving one place when pouring the foundation concrete.

 

(3) Anchor bolt connection problems: the anchor bolt of column base is not tightened, the base plate is not welded with the bottom plate; some anchor bolts with 2-3 threads are not exposed.

 

Measures: Welding bolts and nuts shall be adopted; outside chemical anchor bolts, fire-proof coating and heat insulation treatment shall be added to prevent the anchorage performance from being affected by fire; observation data of foundation settlement shall be supplemented.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
日本久久爱清| 日韩肥胖老妇一区二区| 啊啊啊嗯嗯操AV| 国产熟女不卡| 日本午夜免费福利视频| 黑鸡巴插入女欧美| 免费性生活视频亚洲最大免费| A黄片久久| 激情性爱伦理片Gay在线看| 日本一区一日视频| 中文成人综合| 美女美玖玖爱av| 后入内入一区| 大奶子av不卡| 日本韩亚洲黄色网| 农村人妇在线| 国产日本久久久久九| 国产高清无毛| 日产精品久久久性色| 欧美日韩性生活视频免费观看网页| 欧美胖女人日毴| 无码成人小说网站在线观看| 三级国产精品黄色三级国产| 国产成年黄视频| 国产成人无码中文字幕| 欧美剧情一区国产网页| 波多野成人无码精品视频| 粉嫩人妻91精品蜜| 日本久久内射| 天天色综合成人网| 欧美成人拍拍网站| 麻豆一二三四区乱码视频| 欧美的一级黄片免费再现观看| 加勒比久久爱综合久久爱| 9V久久综合狠狠综合久久| 日本人人操资源| 天天干夜夜操天天爽| 亚州一区二区88| 欧美国产印度美女啪啪视频| 欧美女同专区| 欧美中文一级黄片|