h无码在线观看,夜色色综合网,日韩AV免费久久,蜜臀久久综合视频

Language:CHINESESENGLISH

Home > News > What should be paid attention to when using steel structure?
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://linbaoquan.cn

What should be paid attention to when using steel structure?

Time:[2020-11-23]  Hits:3685

With the rapid development of workshop in our country, the application of steel structure is more and more widely. As we all know, the use of steel structure is very important to the construction of the factory. Therefore, in order to ensure the safe use of steel structure, we must pay attention to the following matters in the process of storage and installation.

1. The steel end shall be marked with steel specification, steel grade, quantity and material acceptance certificate number;

2. When stacking in the open air, the site should be flat, higher than the surrounding ground, and drainage ditches should be set around;

3. When stacking, the profile back should be upward or outward as far as possible to prevent snow and ponding, and there should be height difference at both ends to facilitate drainage;

4. Before installation, the construction unit shall conduct special inspection on the product certificate, design documents and pre assembly records of components, and record the component size;

5. The steel structure should be connected reasonably to make the joint design consistent with the simplified structural calculation model;

6 appropriate measures shall be taken to prevent excessive bending and torsion deformation during hoisting of steel structure. At the same time, a cushion block should be added at the contact between the buckle and the component to prevent damage to the component;

7. After the steel structure is hoisted in place, the support and other connecting components should be tightened in time to ensure the stability of the structure;

8. Whe using tools, aerial operators should put spare parts into tool bags instead of throwing them up and down;

9. When working in rainy days, reliable anti-skid measures must be taken, and attention should be paid to lightning protection in thunderstorm season;

Before the construction, the weather conditions should be optimistic, and the operation is strictly prohibited when the wind is above level 4.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
成人国产日韩欧美一区二区| 操碰喷水| 93色免费视频| 亚洲无码中文在线观看| 加勒比激情av| 一二区黄色电影| 亚洲а∨精品天堂在线| 凸凹人妻人人澡人人添| 大几把艹骚逼视频| 国产熟女久久免费视频| 久久综合香蕉一区| 欧美性爱一区,区三区| 久久粉嫩一区| av伦理大片区| 乱色558欧美| 少妇精品网| 亚洲 日韩 欧美 一区二区三区| 熟妇中文网| 婷婷亚洲91| 亚洲少妇四区| 特级毛片A级毛片免费观看网站| 亚洲大胆人体视频| 国产夫妻家中3p| 91偷国精产品久| 色天使久亚洲| 国产亚洲一区二区视频网站| 搭讪日本人妻,久久网| 二区三区国产精品| 91无码精品国产AⅤ鸭子TV| 人人躁狠狠躁夜夜躁老阿姨| 日本最新三级在线| 在线日本无码中文字幕| 丝袜乱伦 国产欧美| 操B 日韩 欧美| 女女av一区二区| 夜夜爽精品视频| 国产粉嫩美女蜜臀AⅤ| 欧美乱码精品一区中文| 国产精品扒开裤子桶爽| 一夲道青青青青久久久| 31人妻视频一区|