Project cost control for wholesale metal building systems

Time:[2020-10-24]  Hits:3547

Different structural systems, peace, and facade layout have obvious effects on the project cost. In the design stage, only by determining the reasonable layout and facade layout and structural system according to the functional requirements of the building can the project cost be effectively controlled and economically applicable.

 

 

The design of the steel structure of the portal frame steel structure also has the economic span and the optimal spacing of the frame. When the process requirements allow, it is more economical to choose a small-span portal frame. Under normal circumstances, the optimal spacing of portal frames is 6m-9m. When large-tonnage cranes are installed, the economical column spacing is generally 7m-9m. It should not exceed 9m. When it exceeds 9m, roof purlins, crane beams and wall frames The amount of steel used in the system will increase accordingly, and the cost is not economical.

 

 

In the multi- and high-rise steel structures, the engineering volume of the floor structure system occupies a large proportion, which has an important influence on the work performance and cost of the structure. When determining the floor structure plan, the main consideration is to ensure that the floor slab has sufficient plane overall rigidity, which can reduce the weight of the structure and reduce the height of the structure layer, which is conducive to convenient on-site installation and rapid construction, and better fire protection and sound insulation Performance, and easy to lay the pipeline. Common floor slab practices include: profiled steel plate composite floor slab, prefabricated floor slab, laminated floor slab and ordinary cast-in-place reinforced concrete floor slab. At present, the most commonly used methods are profiled steel composite floor slabs and ordinary cast-in-place reinforced concrete slabs. When using these two methods, considering the combination of cast-in-situ slab and steel beam to form a combined beam that bears the common force, the height of the steel beam can be effectively reduced and more steel can be saved.

 

 

In the high-rise steel structure, the frame column adopts the circular steel tube concrete column, and the beams and slabs adopt the steel-concrete composite structure. The total steel consumption is greatly reduced compared with the ordinary steel structure, which can effectively reduce the project cost.

 

The advantages of steel structure construction determine that it will have strong vitality. In the design stage, technological innovation, material selection, and design optimization are the key stages for controlling construction costs and promoting the industrialization of building steel structures.

 

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
亚洲精品国产精品乱码97| 日韩一级欧美一级网| 久久亚洲欧美一区二区图片| 兴文县| 人人澡av导航| 成人久久久精品欧洲高清| 日韩美女肛交无码免费视频| 日本亚洲午夜激情| 美女黄色网啊| 国产电影在线观看一区二区三区| 无码破解视频在线观看| 国产456乱伦| 亚洲天堂无码av| 亚洲国产伦理在线| 无码一区二区h| 国产一七六九在线| 欧美黄片免费二区| 全久久久久久久久久久电影 | 国产欧美剧情一区二区三区91| 亚洲天堂一级| 男人的av视| 国产偷拍一区二区在线| xf丰满人妻一区| 午夜人妻精品| 台州市| 人妻中文字幕精品久久一区二区| 国产性色生活影片在线播放| 欧日韩黄片| 久久久少妇少妇色| 日韩黄黄片| 91自慰区| 一杰性生活网站| 九九精品区一区二| 五月婷婷亚洲无码| 熟女人妻小视频你懂的| 国产精品VS欧美激情| 欧美区亚洲区自拍| 欧美性猛交xxxx免费看| 亚洲图片欧美在线分类| 97国产欧成人免费视频| 日韩,亚洲,欧美www中文|