亚洲国产精品无码久久98温泉中出,国产精品久久久久久黄无码,被俩个黑人前后破苞的女人,99久久久无码国产精品66

Language:CHINESESENGLISH

Home > News > After the completion of the steel structure how to carry out inspection work
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.linbaoquan.cn

After the completion of the steel structure how to carry out inspection work

Time:[2016-10-24]  Hits:4346

    After the completion of the steel structure, then we must carry out inspection work, and we should do to ensure the integrity of the acceptance work? The following steel companies in Shenzhen to do simple to share:
       1, to ensure that the project is to ensure the safety of the project or use an important inspection items. Regardless of the quality rating of qualified or excellent, must all meet the requirements of the required indicators. For different sub-projects, to ensure that the content of the project to ensure that the project only to meet, no fine, qualified points.
        2, the basic project is to ensure the safety of the project or the use of the basic functions of the test items, the indicators points "qualified" and "good" two, is to assess the quality of sub-project an important condition.
        3, to allow the deviation of the project is a sub-project inspection of the provisions of the scope of the project allows the deviation. Inspection and assessment of a small number of points allowed to measure the value of slightly more than the allowable deviation range.
         The above is the summary of the completion of the steel structure of the acceptance of work, if you want to know more or want to purchase, please call!
Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)