Three kinds of steel space truss construction method Guangzhou

Time:[2016-7-13]  Hits:4305

Guangzhou Steel grid construction, there are three methods, namely, high-altitude assembly method, the overall installation method, sliding method altitude. Here Guangzhou Steel Xiaobian you explain.

First, the high-altitude assembly method. Steel truss assembly is the use of high-altitude installation, the location where the design erection bracket assembly, and then use a crane to grid member sub-element air hanging to the design position, but the amount of the bracket assembly method is very large, high-altitude work more. This method is more suitable for high-strength steel truss bolted or bolt ball node.


Second, the overall installation method. It will be assembled into a whole grid on the ground, then lifting equipment to upgrade its entire design of the place is fixed. This construction method altitude less work, less assembly bracket, but also to ensure the quality of welding, which is focused on technical and lifting equipment. Overall installation method spherical joints steel truss apply. For different lifting equipment, installation as a whole is divided into multi-machine method Hoisting method, pull the lever lift-off method, electric screw lifting method.

Third, the high-altitude sliding method. In recent years, high-altitude construction parallel slip more and more, this approach is often more suitable for Guangzhou Steel theaters, auditoriums and other projects. Mostly on the grid auditorium bleachers set up assembly platform Tower, a building element assembly is completed, and then assemble the second unit, and so continue to slip forward assembly, direct access to the entire grid assembly is completed and moved into the place position.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
欧美人妻制服诱惑丝袜| 脚交精品网站| 综合高清不卡无码| 欧美日韩成人在线暗网不卡| 91制片一区二区三区| 精品人妻无码瑜伽老师一区二区 | 精品久伊人| 一本色道久久加勒比88| 国产热| 国产欧美日韩重口在线观看| 精品午夜久久福利| 乱草一区二区国产| 按摩精品在线| 密臀丁香婷婷| 国产产AV女优一二区三区| 夜夜爽夜夜爽夜夜爽夜夜爽夜夜爽 | 大奶比比一区二区| 精品国产美女视频| 欧姜小黄片| 日天天天天日操天天| 青青草免费av在线| 亚洲色婷婷久久网| 精品久久久久久黑人国产| k8人妻电影| 丝袜做爱久久| 韩日av毛片在线| 九九内射欧美| 日韩熟女情趣AV在线| 69伦理视频| 素人偷拍 精品二区| 亚洲AV成人一区二区三区久久| 国产欧美成yy| 精品欧美黄| 日本 亚洲 欧美一区二区| 丝袜伦理短视频| 日本丰满白嫩少妇11p| A级毛片无码真人久久| 曰韩黄色一级视频在线播放| 国精品网站| 欧美一级黄色片孕妇| 欧美综合在线五月婷婷|