h无码在线观看,夜色色综合网,日韩AV免费久久,蜜臀久久综合视频

Language:CHINESESENGLISH

Home > News > Foshan three steel steel truss construction method
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://linbaoquan.cn

Foshan three steel steel truss construction method

Time:[2016-6-11]  Hits:5159

A high-altitude assembly method
Steel truss assembly method by high-altitude installation, erection is first assembled bracket design position, and then use a crane to grid member sub-element (or block) to the design position hanging in the air, were assembled on the bracket. Sometimes this method does not need large-scale lifting equipment, but the bracket assembly large amount of aerial work more. Therefore, the high strength for steel pipe truss with steel production of steel truss or bolt ball node is more appropriate, there are still a number of steel truss construction method has been applied.

Second, the overall installation method
Overall installation method is to first grid on the ground assembled into a whole, and then lifting equipment designed to enhance its overall position to be fixed. This method of construction without assembling the bracket tall, aerial less easy to ensure the welding quality, but requires a large crane lifting equipment, technology is more complex. Therefore, this method of spherical joints steel grid (especially three-grid and other bars more grid) is more appropriate. Depending on the equipment used, the overall installation method is divided into multi-machine Hoisting method, pull the lever to enhance the law, law and jack lifting jack lifting method.

Third, the high-altitude sliding method
In recent years, the use of aerial roof truss construction by parallel sliding gradually increased, it is especially suitable for theaters, auditoriums and other projects. This method of construction, the grid assembly platforms are situated in the building lobby top plate assembly (erection can be assembled on the platform assembly auditorium bleachers), to be the first assembly unit (or first stage) assembly is completed, it is about to fall on the sliding track, traction equipment from sliding forward a certain distance. Then assembled on the platform of the second assembly units (or second), after a good fight, together with the first assembly unit (or first stage) with slip forward, so ask before slipping constantly assembled piecemeal, until the entire grid assembly is completed and moved to place the slide position.

Good slip assembly grid, the grid can be set up under the carriage wheel, the roller slide on the slide rail; also in the grid holder under the seat bottom, so embedded in the bearing plate along the reinforced concrete frame beam embedded steel slide.
Slip grid or lever hoist winch available traction. According to the lever bearing capacity and traction grid size between supports, may be one or more points of traction. When the grid slip ends sync value should not exceed 50mm.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
久久无码一区二区三区| 欧美中文字幕乱码| 99日韩性爱电影| 被大鸡巴操出白浆| 成人少妇高潮v片特黄| 3五十路の熟女| 尤物在线一区中文字一区| 国产精品国产三级国hongtao| 天天干天天操人人操| capporn亚洲| 爱福利一区视频| 日本中文一区二区视频| 久久久久久久久久久久久久久看看看 | 综合欧美激情| 美女操鸡鸡视频在线观看| 夫妻看性生毛片| 日韩图片一、二视频在线播放| 国产乱码欧美视频精品一区二区| 美女操逼吸奶| www,久久黄色片| 中文字幕偷拍亚洲| 黑粗大国产| 欧美一区二这和三区| 成人激情视频区| 日韩 成人 视频 色情| 五月婷婷 婷婷五月 一区二区 | 日韩中文字幕av第一页| 激情婷婷开心色五月天| 999国内永久精品免费视频| 久久精品少妇一区2区| 五月婷婷五月激情在线欧美专区| 久久999黄色| 大黑吊一区二区三区| 色呦网站| 久久五月精品视频| 男人av天堂国产一区二三区| 一二区xxxx| 网友自拍一二三区| 亚洲四虎成人自拍| 久久黄色三及片| 国产精品久久久三级18|