亚洲国产精品无码久久98温泉中出,国产精品久久久久久黄无码,被俩个黑人前后破苞的女人,99久久久无码国产精品66

Language:CHINESESENGLISH

Home > News > steel girder segment energy dissipation structure connected column which requests?
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.linbaoquan.cn

steel girder segment energy dissipation structure connected column which requests?

Time:[2015-10-31]  Hits:4197

Guangzhou Steel tells you: steel girder segment energy dissipation structure connected column which requests?


Link beam connection with a rigid frame column nodes, connected with the general framework slightly different pillars.
When energy beams and column connections, its length should not be greater than 1.6M1p / Vb, energy beams between the flange and the webs between the link beam and column flange or flange (when link beam and column web connections) should selection groove full penetration butt welds, fillet welds should be used between the web and post-energy beams instead of bolting, due to slip the bolts will affect the ductility and energy dissipation capacity.
Carrying Capacity of fillet welds shall not be less than the axial bearing capacity web link beam, shear capacity and flexural capacity. Guangzhou Steel

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號