亚洲国产精品无码久久98温泉中出,国产精品久久久久久黄无码,被俩个黑人前后破苞的女人,99久久久无码国产精品66

Language:CHINESESENGLISH

Home > News > Chifeng "Bird's Nest" National Steel Award
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.linbaoquan.cn

Chifeng "Bird's Nest" National Steel Award

Time:[2015-4-22]  Hits:5041

Chifeng "Bird's Nest" National Steel Award
 
    April 15 - 17 May, 2015 National Building steel industry conference held in Shanghai Everbright Convention & Exhibition Center. At the meeting, Chifeng City Sports Center Phase II project (design name "Blue Hada", folk called "Chifeng Bird's Nest") was ranked eleventh (2014 year), "China Steel Gold", which is the city's first eligible this award.
    China State Construction Engineering Steel Gold, referred to as "steel Gold" is the Chinese steel industry, construction engineering quality, the highest honor award (National Quality Engineering). By China Construction Metal Structure Association committee organizing the implementation of construction steel, selected once a year. As early as November 20, 2014, the jury China Construction Metal Structure Association Committee on construction steel body established on the sports center of Chifeng Steel Works management information, on-site quality verification, on-site management, entity Quality Experts Group given a high rating, so this was named the 2014 annual China smoothly Steel Gold Project.
    Chifeng Sports Center two projects by the stadium, gymnasium, center platform and underground garage, with a total construction area of ​​about 90,000 square meters; the main structure of the stadium with a steel reinforced concrete structure, with a tube truss steel awning, gymnasium roof with a ball grid spatial structure, with a total of about 8000 tons of steel. Project in May 2011 to start the construction, start at the beginning, bear construction general contracting unit of Beijing Urban Construction Company to assist the designer of nine steel structure design of the project carried out a number of optimization, such as increased support columns, change the circle square steel pipe etc., steel and cost savings of up to 30%. During construction, they also use their own advantages, inviting well-known experts on the steel structure steel construction program review, on-site construction guidance, quality control and other measures in the construction process, strengthen and ensure the construction of steel works Chifeng Sports Center quality.
Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號