1. Steel parts and steel components processing requirements

Time:[2015-2-28]  Hits:5080

1. Steel parts and steel components processing requirements:
  Cutting surface or cut surface of steel, should be no cracks, slag, stratification and greater than 1 mm of missing edge, should fully checked.
Carbon structural steel at ambient temperature is below -16 ℃, low-alloy structural steel at ambient temperature is below -12 ℃, not cold cold bending and straightening.
Steel surface after the correction, there should be a clear concave or damage, scratches depth of not more than 0.5mm, and should not be greater than the thickness of the steel allows negative deviation 1/2.

2. Steel welding requirements:
  (1) Welder
  Engaged in steel welders welding work must obtain a certificate and pass the examination. Welders welding must pass the examination within its scope the project and recognized.
  (2) Non-destructive testing
  Design requirements for full penetration of the primary and secondary weld ultrasonic testing should be used to check the internal defects, ultrasonic testing can not judge when the defect should be used radiographic inspection, and testing its internal defect classification methods should be consistent with existing national standards regulations.


3. Fasteners Requirements:
  Steel production and installation of units should be required strength bolts were even anti-slip friction coefficient test and retest the surface, the friction surfaces of the scene should be a separate component for anti-slip coefficient test results should meet the design requirements.


4. Steel and steel component assembly installation requirements:
  (1) H-beam flange plate welded seam and web seam spacing of not less than 200 mm.
  (2) cranes and crane girder trusses in place after installation should not be under the scratch.
  (3) multi-section column installation, locate the axis of each section of the column should be drawn directly on the ground to control the axis, the axis must not lead from the lower column, to avoid excessive accumulation of errors.
  (4) After completion of the steel truss structure and the overall fight after completion of the roof should be separately measured deflection, deflection, and the measured value shall not exceed 1.15 times the corresponding design values.
  (5) paint, painting several times, coating thickness shall meet the design requirements.
  (6) a thin coating fireproof paint coating thickness shall comply with the relevant requirements of the fire resistance design.


5. Steel Division project completion and acceptance requirements.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
大大香蕉在线视频网站| 日日韩欧美精品| 电影天堂国产男人AV| 欧美日韩大片一区二区久久天堂| 久久中文字幕亚洲精品最新| 亚洲欧洲2019无码中文| 九九人妻二区| 日本黄色后入| 性东北性午夜生活| 日韩无线码在线视频| 亚洲字幕无码日韩| 国产精品高潮露脸一区图片| 青青草Av一二三区| 亚洲区欧美的| 亚洲另类自拍欧美| 国产精品日韩第一页图| 熟女一区的二区二| 欧美一区一本道无码| 鲁啊鲁成人影视| 小草免费在线视频一区二| 国产麻豆精品一区| 日韩精品欧美激情| 色婷婷秘 一区二区三区| 搜索看欧美黄片| 欧美性视频久久久久久久久久| 天天碰天天日射夺皮批| 亚州精品性舌活| 日韩中文字幕伦理大片| 久久精品五月婷婷| 视频免费观看一区二区| 亚洲人妖一二区| 久久精品久久久久不卡…| 国产精品乱码一区二飞| 北条麻妃一区二区精品| 艹逼视频免费播放| 日韩av第一区| 99精品 岛国| 182Tv午夜成人免费视频| 在线资源一区| 欧美大香蕉乱能| 国产精品久久国产精品久久|