h无码在线观看,夜色色综合网,日韩AV免费久久,蜜臀久久综合视频

Language:CHINESESENGLISH

Home > News > Mixed steel installation drawings and design changes
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://linbaoquan.cn

Mixed steel installation drawings and design changes

Time:[2014-9-27]  Hits:5432

        Drawings should be carried out before the installation of steel joint hearing before the joint hearing of construction units should be familiar with and master design file contents, find the component mounting problems affecting the design and review with other professional engineering with inappropriate ways.
  
1 drawing Mixed

Before installation of steel structures, construction units in order to solve problems in a familiar drawing found during the technical problems and quality problems found in the drawings nipped in the bud, the parties participating in the construction drawings to conduct joint hearing.
Mixed content drawings generally include:
Qualification (a) meets the design units, drawings, whether by design unit officially signed.
(2) design units to do the design intent description and proposed process requirements, the main production unit introduces steel production process.
Have a contradiction between (3) professional drawings.
(4) between each drawing plane position, elevation, etc. are the same, mark whether the omission.
(5) the professional construction and construction procedures with or without problems.
Construction methods (6) Install the unit can meet the design requirements.

2 design changes

In the construction drawings before use, after use of design changes will occur due to the construction unit requirements, or changes in construction site conditions, or changes in national policies and regulations and other reasons caused. Design change for whatever reason, who proposed the construction unit must obtain the written consent and apply the change. There will schedule and cost impact of design changes, in strict accordance with the regulations should be implemented in order to clarify responsibilities and avoid claims event is not conducive to the construction.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
欧美精品二区三区四区五区| 加勒比后入av| 久久人人做| 综合AV天天| x在线观看黄| 香港精品一二三区| 国产精品48页| 成人女色| 91人妻porny九色大屁股| 好吊纽免费视频| 日无码中文字幕豆| tiantian在线精品视频| 日韩不卡一区视频| 久久ww91| 人人看人人爽92| 人妻互换一区二区三区在线视频 | 亚洲日本日B在线| 中文字幕日本人妻久久免费| 我把黑丝美女操喷水内射视频| 欧美久久人兽| 日韩欧美精品一级片| 人妻在线日本| 91无码精品人妻| 成人精品香蕉| 一本色道88久久亚洲综合加勒比 | AV在线不卡永久免得观看| 日本精品高| 小骚逼想被艹逼av| 亚洲欧洲Av综合一区二| 2025麻豆一区二区三区| 亚洲黄色乱小说| 日本91男女高潮| 久久人妻AV电影| 91亚洲欧美日韩| 欧美成人A片HD4KAV| 久久精品国产99国产精2019| 国产欧美第一区在线| 亚洲欧美高清一区| 中心社区少妇AV| 亚洲欧美蜜| 亚洲午夜黄色片|