Key Points of Column Installation in Steel Structure Workshop Construction

Time:[2022-12-24]  Hits:3797

The steel column is one of the main components of the steel structure plant. As its name implies, the steel column is a column made of steel. There are two types of section forms - solid web column and lattice column. For the steel column device, the component shall be rechecked after mobilization and during installation, and the number, size, shape, connection hole orientation and other attributes shall be consistent with the drawings one by one before the component device construction.

 

 

1. Elevation observation points and center line signs shall be set before the installation of steel column components. For a plant project, the observation points and signs shall be set in the same direction, and shall conform to the following provisions:


First of all, the setting of elevation observation points shall conform to the following provisions: the setting of elevation observation points shall be based on the bracket (shoulder beam) bearing surface, and shall be set at the position convenient for observation of the column; For column without bracket (shoulder beam), the center of the top device hole connecting the column top and the truss shall be taken as the benchmark.


Then, the setting of center line sign shall conform to the following provisions: a center sign shall be set in the direction of the upper line on the surface of the column base plate, and a center sign shall be set on both sides of the line direction; A center line shall be set at the upper line and column line direction of the column body, and a center mark shall be set at the bottom, middle (bracket or shoulder beam) and top of each center line; The double bracket (shoulder beam) column is set with center marks on the outer surface of the two column shafts in the line direction.


2. During the construction of steel structure plant, the multi section column device shall be assembled into a whole and then hoisted.


3. The correction of steel column device shall comply with the following provisions: eliminate the deviation caused by side sunlight; The verticality deviation of the column shall be controlled according to the temperature (season). After the crane beam, roof truss device and crane beam are adjusted, fixed and connected, the steel column shall be retested, and those exceeding the allowable deviation shall be adjusted in time.


4. For columns with large slenderness ratio, temporary fixing measures shall be added after hoisting.


5. The installation of inter column support shall be carried out after the alignment of columns, and the inter column support shall be installed under the condition of ensuring the verticality of columns.


Quality is the life of construction projects. Quality is the first priority in the construction of steel structure workshops. Only quality is the first, can an enterprise have a long term. Only good process methods and correct and reasonable operation methods can ensure the high-quality completion of the project.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
亚洲中文乱码成人| 亚洲无码欧美精品| A天堂资源在线管网国产精品| 香蕉视频真人版一区| 男人天堂AV手机在线| 国产男人av天堂| 久久婷婷午夜| 大香蕉少妇精品网| 精品人妻中文字| 欧美精品一区二区无码| 亚洲国产精品天堂| 俄罗斯操逼三区四区| 嗯嗯啊啊啊啊啊啊啊视频| 国产乱码一区二区三区网站| 日韩视频色| 亚洲超碰麻豆大象| 欧美色人妖百度| 国产伊人久久视频| 香蕉视频伦理在线| 欧美在线免费1区2区3区| 日本肥胖人妻aⅴ| av麻中文| 欧美精品精| 亚洲天堂无码啊啊啊操| 这个熟妇色xxxxx| 亚洲欧洲av亚洲高清在线| 五码福利视频| 国产as日本精品有码| 久久国产麻豆免费播放| freeporn 爱欲 一区二区| 加勒比AV黄色| 蜜臀91九色在线| 亚洲色色欧美| av黄色在线观看亚洲黄色| 好吊妞热热色久| 久久久伊人亚洲| 亚洲中文 另类自拍| 曰本久久中文字幕| 抽插小嫩逼av| 日韩午夜性生话| 三级理论中文字幕在线播放国产精品 |