Problems needing attention in the process of steel structure construction

Time:[2022-8-29]  Hits:2429

The steel structure construction project has become more and more popular in recent years, and the problems to be paid attention to in the construction process are particularly important. Generally, many safety problems can be avoided only by the following points. Next, I'll talk to you.

 

First, the size of reinforcement holes shall be reserved before and after construction


In particular, the holes on the section steel can be as small as possible, so that the steel can have good strength. In addition, the loss of profile steel shall be reduced to facilitate construction. In addition, when drilling the steel structure, the two symmetrical sides of the reinforcement shall be taken into account. It is particularly noted that the edge of the reinforcement with a diameter greater than 25mm may increase the diameter of the reinforcement by 1 ~ 2mm.


Second, the position of reinforcement holes must be reserved in advance


When drilling, the upper, lower, left and right positions shall be aligned accurately, otherwise it will be very difficult to pass through the reinforcement. If the information of the construction party responsible for the construction of section steel is inconsistent with that of the civil construction party in the practice of steel structure construction, the two parties need to communicate in time during the construction process.


Third, installation details of bottom steel column


If the embedded steel column at the bottom is light, we can use machinery for lifting, and manual position calibration can be done. This has many advantages.


First, the accuracy of the mounting position can be ensured; Second, because the component processing plant has completed the foundation fabrication of the steel column, the center of the profiled steel column and the center of the base plate must be coincident during fabrication, so the corresponding outer contour is parallel; Third, use the tower crane or other auxiliary installation machinery to lift the foundation embedded column, and then slowly lower the foundation embedded column. In this way, the four corners of the column base plate are aligned with the contour line, and the base plate of the column base is on the mat. Striking while the iron is hot will save time and labor, and can greatly improve the progress of the steel structure construction.


In addition, we can calibrate the position of the foundation embedded column with the help of two theodolites. Then fix the two theodolites on the vertical and horizontal axes of the column, and then move the position of the column to make the front center line of the column coincide with the viewpoint of the two theodolites, which can ensure the verticality of the column.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
四川人妻3p视频在线| 欧美日韩在线看片| 国产精品大屁股av在线播放| 久久国产线看精品观看yw| 日韩欧美国产成人精品在线| 亚洲综合无码在线视频观看| 啪啪91国产| 精品少妇人妻av久久久| 懂色AV一区二区夜夜嗨| 欧美日韩中综合网| Av一区二区播放| 久久久亚洲最大综合| 一区二区三区av久久久| 欧美成人日韩a| 国产成人久久一二| 亚洲精品第112页| 丁香婷婷深爱网| 荷兰AV一区二区三区| 美女网站黄av| 欧美日韩国产91伊人| 红杏网址AI换脸在线观看无码| 荷兰美女久久国产精品高潮| 丰满少妇高潮久久三区| 在线激情无码| 日本在线精品一区二区不卡麻豆| 看一级少妇性高潮黄片| 熟女99| 欧美日韩亚洲免费四区| 日本一二三区欧美易域名| 99久久密| 熟女性免费视频| 午夜激情成人福利色| 吃大机巴插屁股上欧美国产视频精品 | 天天射天天干亚洲69| 五月婷婷在线免费下载无卡顿| 啪啪啪啪啪国产一区二区影视| 欧美三十成人| 天天爽晚晚爽AV| 成人性生活免费视频| 色呦呦AV在线播放| 不卡的AV免费看|